美女裸体十八禁免费网站,国产成人免费ā片在线观看老同学 ,久久久国产打桩机,伊人久久大香线蕉av综合

Service hotline:

0315-5913666

+86-18931500255

Domestic > Zaozhuang Mining Group Chaili Coal Preparation Plant Renovation and Expansion Project
18棗莊礦業(yè)集團柴里礦選煤廠改擴建工程.jpg
  • 18棗莊礦業(yè)集團柴里礦選煤廠改擴建工程.jpg

Zaozhuang Mining Group Chaili Coal Preparation Plant Renovation and Expansion Project

Type: Coking coal preparation plant

Scale: 2.40Mt/a

Contracting mode: design+partial equipment supply, renovation project

Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. The coarse coal slurry is sorted by the coal slurry heavy medium cyclone, the fine coal slurry is sorted by a flotation machine, and the flotation clean coal is dehydrated and recovered by a horizontal settling filtration centrifugal dewatering machine and a filter press. The tail coal slurry water is concentrated in the thickener and then dehydrated and recovered by a filter press. The washing water is circulated in a closed circuit, which is environmentally friendly and energy-saving.